The gap that nobody specifies for
Automatic changeover takes seconds: the grid has to be seen to fail, and the generator has to start and reach speed. Servers restart and tills lose transactions in that gap. The UPS covers only those seconds, on the circuits that cannot survive them, then hands over.
What gets installed
Automatic transfer
Moves the building between grid and generator, with nobody in the switch room.
Generator
Sized from the metering, not from an estimate.
UPS
On the circuits that cannot take a gap, chosen from the metering.
Tested under load
Commissioned as one system, with the transfer proved under load, not on paper.
Sized from a measurement
A generator sized from an estimate is usually too large, and one that runs far below its rating glazes and wears early. One sized too small refuses the load or lives at its limit. Both come from the same cause: nobody measured first.
Where the real bill is
Where the grid fails often, the fuel costs more than the equipment. A battery covers the short outages so the generator never starts for them, and solar refills the battery without burning anything. Backup is where a site begins, rarely where it should end.
Questions we are asked
Do I still need a UPS if I have a generator?
If anything in the building cannot tolerate a few seconds without supply, yes. A generator has to start and reach speed before it can accept load, and automatic changeover cannot remove that interval. The UPS covers it on the circuits that need it covered.
How is the size of the generator decided?
From measured demand, not an estimate. We meter what the building actually draws, circuit by circuit, and that reading sets the rating. A generator sized defensively runs far below its capacity, which costs more to buy and more to own.
What does automatic changeover do?
It detects that the incoming supply has failed, starts the generator, and transfers the building to it without anyone going to a switch room. When the grid returns it transfers back.
Can this be added to a generator that is already installed?
Usually. The metering and the transfer arrangement can be fitted around existing plant. Whether the existing machine is the right size for the building is a separate question, and it is one the measurement answers.
Start with the measurement
Tell us what the building has to run and what it costs you when the power goes. We will meter it before anyone quotes equipment.