EV charging

A car is the largest single load most buildings will ever add.

Start a project

Why this part comes last

A charger is new, substantial demand, and it arrives when the building is busiest. Fitted without reference to the rest, it trips the board on the one evening everything coincides, a fault that is hard to reproduce. So it is fitted last, onto a system that can see the building.

What gets installed

  • Charge point

    On the same system as the rest of the building.

  • Metering connection

    Lets the charger see the building, and measures the car like every other load.

What load management does

The charger gets the headroom actually available, measured continuously. When the building is quiet the car charges at full rate; when it is busy the charger gives way. The car still charges, and nobody has to think about which appliances they can run.

A villa and a car park are the same problem at different scale

In a house it is one car against one building. With shared parking it is several bays against one supply, the headroom shared across the bays in use. Either way, the alternative is upgrading the supply for a peak that rarely happens.

Questions we are asked

Will charging a car trip the board?

Not with load management. The charger is given the headroom that is actually available, measured continuously, and reduces its rate when the rest of the building is busy instead of competing with it.

Can several cars charge at once?

Yes. In shared parking the available headroom is shared across the bays in use rather than promised in full to each one, so the bays cooperate instead of contending.

Do I need to upgrade my supply to install a charger?

Often not. Upgrading the supply covers a peak that happens rarely and is an expensive way to avoid a calculation. Load management is the calculation.

Can a car charge from solar?

Where solar and storage are part of the same system, yes. The charger is one more load the system arbitrates between sun, battery, grid and generator, under the same priority as everything else.

Start with the measurement

Tell us what the building has to run and what it costs you when the power goes. We will meter it before anyone quotes equipment.