What is LinkedTech Power?
LinkedTech Power manages a building’s electricity as one system: metering and control on every circuit, automatic changeover with generator and UPS, solar with battery storage, and EV charging with load management.
Most power work starts with a quotation for equipment. This starts with a measurement of what the building actually draws, and that measurement sizes everything after it.

One system, four parts
Some or all of the four, commissioned as one system and answering to one team.

Metering and circuit control
Modules go into the board you already have, so nothing is rewired. Every circuit is measured and every circuit can be switched, which means you stop guessing which part of the building is spending the money.

Changeover, generator and UPS
Automatic transfer between the grid and the generator, with UPS holding the gap. The lights do not blink, the servers do not drop, and nobody walks to a switch room at nine at night.

Solar and battery storage
Panels, inverter and storage sized to what the building actually draws, which is a number we measure first rather than estimate. The system decides between sun, battery, grid and generator on its own.

EV charging
A charger on the same system as everything else, with load management, so charging a car at seven in the evening does not take the board out.
We have done this at the hard end
Our engineers automated telecom data centres in East Africa, putting sensors and network presence across the plant so they run without anyone standing in them. The power cost came down. A villa is a smaller version of the same problem, and a hotel sits between them.
Questions we are asked
What does LinkedTech Power include?
Four parts, each with its own page: metering and circuit control; backup power with changeover, generator and UPS; solar and battery storage; and EV charging.
Where does a Power project start?
With measurement. Metering shows what each circuit draws, and that reading sizes the generator, battery or solar array, so nothing is specified from an estimate.
Does the building have to be rewired?
No. The metering and switching modules fit into the distribution board that is already there.
How do I start?
Answer seven questions about the building on the Start a project page, or book a consultation. We meter the building before anyone quotes equipment.
Start with the measurement
Tell us what the building has to run and what it costs you when the power goes. We will meter it before anyone quotes equipment.