Why this is the first thing we fit

An electricity bill is one total, and a total cannot be acted on. Metering turns it into one figure per circuit, so the air conditioning separates from the lighting and the kitchen from the server room. Everything after it, from changeover to charger, is sized from that measurement.

What gets installed

  • Circuit metering

    Every way in the existing board is measured. No second board and no rewiring.

  • Circuit control

    Every way can be switched as well as seen. A circuit you cannot control is a diagnosis without a treatment.

What you have afterwards

A live reading for every circuit and a record over time, so you can see what the building draws at two in the morning, on a Friday, or since new equipment arrived. And any circuit can be turned off without walking to the board.

Two buildings, opposite questions of the same data

Where the grid is dependable, the data answers cost: which loads are large, and which could run at a cheaper hour. Where it is not, it answers what must keep running, and that list sizes the generator and battery to fit, neither short nor extravagant.

Questions we are asked

Does the building have to be rewired?

No. The measuring and switching elements fit into the distribution board that is already there. Circuits are not re-routed and a second board is not added.

What does per-circuit metering actually tell me?

What each circuit draws, live, and what it has drawn over time. That separates the air conditioning from the lighting and the kitchen from the server room, so a decision about energy can be made against a reading rather than an assumption.

Why measure before quoting equipment?

Because the measurement sizes everything after it. A generator, battery or array specified from an estimate is either short when it matters or money sitting idle. We meter what the building draws and the result decides the specification.

Can circuits be switched remotely as well as measured?

Yes. Every way that is measured can also be switched, so a circuit can be turned off without anyone going to the board.

Start with the measurement

Tell us what the building has to run and what it costs you when the power goes. We will meter it before anyone quotes equipment.

No obligation · We reply within four hours